{br} STUCK with your assignment? {br} When is it due? {br} Get FREE assistance. Page Title: {title}{br} Page URL: {url}
UK: +44 748 007-0908, USA: +1 917 810-5386 [email protected]

write an individual report including the following:
A. For the Smith’s Dock site at North Shields in Newcastle, the project aims to develop a sustainable
housing scheme with consideration for inclusive living
B. Analyse the project and propose an appropriate Modern Methods of Construction (MMC) and
offsite construction methodology for the project. Your proposed method needs to be justified by
providing the advantages of the method for the project.
C. Identify 3 major challenges in the planning, design and construction phases of your project that
can be addressed by Building Information Modeling (BIM). The challenges must be specific to
Smith’s Dock site and the project option, and the MMC method that you selected.
D. Describe the potential consequences of not properly addressing the three challenges to the
project time, cost, quality, safety, sustainability, and/or productivity (you need to clearly explain how
each challenge could negatively impact one or more of these items).

This question has been answered.

Get Answer
WeCreativez WhatsApp Support
Our customer support team is here to answer your questions. Ask us anything!
👋 Hi, how can I help?